【美今詩歌集】【作者:童驛采】1999年~2020年 |訪問首頁|
張含韻
   

張含韻

 找回密碼
 註冊發言
搜索
查看: 19|回復: 0

What to confirm before your home elevator installation begins in Delhi?

[複製鏈接]

13

主題

0

回帖

61

積分

註冊會員

Rank: 2

積分
61
發表於 2026-6-9 18:31:00 | 顯示全部樓層 |閱讀模式
After speaking with several families across Delhi, Gurugram, and Noida who have gone through home elevator installation in the last two years, here is a consolidated pre-installation checklist that could save you significant delays and costs:
1. Shaft dimensions confirmed by the elevator company's engineer- not just the builder.   
2. Civil contractors and elevator companies have a shared written timeline with dependencies clearly marked.   
3. Electrical load calculation done- confirm your DB board can handle the elevator's starting current (typically 15–20 amps for residential lifts).   
4. Pit waterproofing completed and cured BEFORE equipment arrived- wet pits are the number one cause of installation delays.   
5. Flooring and wall finishing around the elevator landing points confirmed as complete or deliberately left for post-installation.   
6. Elevator company has confirmed delivery date in writing- equipment should not sit on-site for more than 3 days before installation begins.   
7. AMC (Annual Maintenance Contract) terms reviewed and signed as part of the purchase agreement.   
The best elevator installation experiences we have heard about all share one common factor- the elevator company took ownership of coordinating with other trades, not just delivering their own scope. Attico Elevators is one of the few companies offering this level of coordination for residential elevators in Delhi , and it shows in their client feedback.
回復

使用道具 舉報

高級模式
您需要登錄後才可以回帖 登錄 | 註冊發言

本版積分規則

Archiver|手機版|小黑屋|張含韻

GMT+8, 2026-6-25 04:40 , Processed in 0.105505 second(s), 18 queries .

Powered by Discuz! X3.4

© 2001-2023 Discuz! Team.

快速回復 返回頂部 返回列表